ADI
AD694ARZ-REEL
Reference stock — availability confirmed before quotation.
- Reference total qty
- 1 pcs
- Factory lead time
- 49 weeks (factory lead time, reference)
Lot breakdown (Date Code + qty)
Batches marked for review are shown as supplied in the inventory feed — not reinterpreted on this page.
- 2532+/2533+/2534+:1
| Date Code / Batch | Qty (pcs) |
|---|---|
| 2532+/2533+/2534+:1 | |
Actual stock photos
Reference photos of material on hand; date codes shown for traceability only — not a quantity commitment.

2532+

2532+

2550+

2604+ · 2605+

2605+

2605+ · 2606+

2606+
Quality & Inspection — UUCCE
Every lot we sell passes the same five checks before it is quoted or shipped. Photos of the actual lot are available on request.
Source verification · Visual inspection · Label & date-code check · Photo record · ESD-safe packing & final check
1. Source verification
Lots are sourced from franchised channels, OEM surplus and vetted distributors; origin is recorded per lot.
2. Visual inspection
Marking, pin condition, packaging and moisture-barrier integrity are inspected under magnification.
3. Label & date-code check
Reel and box labels are checked for consistency; the date code we publish is the date code on the label.
4. Photo record
Each stocked lot is photographed in our warehouse; the stock photos on this site are our own inventory.
5. ESD-safe packing & final check
Parts are packed to ESD and moisture standards and re-checked against the order before dispatch.