ADI
AD8226ARZ-R7
Reference stock — availability confirmed before quotation.
- Reference total qty
- 18,250 pcs
- Factory lead time
- 49 weeks (factory lead time, reference)
Lot breakdown (Date Code + qty)
Batches marked for review are shown as supplied in the inventory feed — not reinterpreted on this page.
- 2524+5,000 pcs
- 2447+1,000 pcs
- 2524+1,000 pcs
- 2321+346 pcs
- 2321+500 pcs
- 2524+10,000 pcs
- 2447+278 pcs
- 2303126 pcs
| Date Code / Batch | Qty (pcs) |
|---|---|
| 2524+ | 5,000 |
| 2447+ | 1,000 |
| 2524+ | 1,000 |
| 2321+ | 346 |
| 2321+ | 500 |
| 2524+ | 10,000 |
| 2447+ | 278 |
| 2303 | 126 |
Quality & Inspection — UUCCE
Every lot we sell passes the same five checks before it is quoted or shipped. Photos of the actual lot are available on request.
Full inspection process →On-site warehouse & handling
Carton & label close-ups
- 1
Source verification
Lots are sourced from franchised channels, OEM surplus and vetted distributors; origin is recorded per lot.
- 2
Visual inspection
Marking, pin condition, packaging and moisture-barrier integrity are inspected under magnification.
- 3
Label & date-code check
Reel and box labels are checked for consistency; the date code we publish is the date code on the label.
- 4
Photo record
Each stocked lot is photographed in our warehouse; the stock photos on this site are our own inventory.
- 5
ESD-safe packing & final check
Parts are packed to ESD and moisture standards and re-checked against the order before dispatch.
For qualifying orders, third-party laboratory testing can be arranged on request — ask us before you order.







