service1@uucce.com

First response within 2 business hours on business days. Formal quotation within 1 business day.

uucce.com

ADI

ADUM1300ARWZ-RL

Reference stock — availability confirmed before quotation.

Reference total qty
3,485 pcs
Factory lead time
52 weeks (factory lead time, reference)

Lot breakdown (Date Code + qty)

Batches marked for review are shown as supplied in the inventory feed — not reinterpreted on this page.

  • 2606+3,475 pcs
  • 22428 pcs
  • 22422 pcs

Actual stock photos

Reference photos of material on hand; date codes shown for traceability only — not a quantity commitment.

  • ADUM1300ARWZ-RL stock — date code 2606+

    2606+

Quality & Inspection — UUCCE

Every lot we sell passes the same five checks before it is quoted or shipped. Photos of the actual lot are available on request.

Source verification · Visual inspection · Label & date-code check · Photo record · ESD-safe packing & final check
  1. 1. Source verification

    Lots are sourced from franchised channels, OEM surplus and vetted distributors; origin is recorded per lot.

  2. 2. Visual inspection

    Marking, pin condition, packaging and moisture-barrier integrity are inspected under magnification.

  3. 3. Label & date-code check

    Reel and box labels are checked for consistency; the date code we publish is the date code on the label.

  4. 4. Photo record

    Each stocked lot is photographed in our warehouse; the stock photos on this site are our own inventory.

  5. 5. ESD-safe packing & final check

    Parts are packed to ESD and moisture standards and re-checked against the order before dispatch.

Full inspection process →